WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

289

Discipline/Origin

Drilling
No origin

Well

Brasse
31/7-3 S

Date created

2019/10/02
2257 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic


What happened in Top hole:
Seabed visibility poor and current high when cementing 30″ conductor. Inclination on bullseyes suggested 1 degree or less, but changed to 1.5 degrees when the 13 3/8″ was landed. This prompted a check on cement level depth via the PGB cementing funnels – which showed cement 17 m below seabed. Possibly/probably connected to heavy boulders drilled below seabed.

What Was Planned

Cement 30″ conductor

What Was Learned

Is there an LCM which can be added in such cases?

What Actions Are Required

Investigate if there is a LCM which can be added.